Worked example

An engineer is checking whether a packaged rooftop unit rated at 0.90 in. w.g. external static can serve a small office with a critical path of duct, one elbow-heavy return, a MERV 13 filter and VAV terminals.

  1. 1

    Add the critical-path duct losses

    Supply duct 0.28 + return duct 0.17 = 0.45 in. w.g.

    Only the highest-loss path counts — branches are not added together.

  2. 2

    Add the external components

    Filter 0.25 + VAV terminal 0.12 + grilles 0.08 = 0.45 in. w.g.

    Coil drops count only if the unit's rating excludes them — check the fan table basis.

  3. 3

    Total and apply the design margin

    TESP = 0.90; design = 0.90 × 1.10 = 0.99 in. w.g.

    The calculator flags when design static exceeds the entered rating.

Takeaway: This unit is short by 0.09 in. w.g. before anyone touches the fan curve — the fix is usually cutting return losses or stepping up the unit, not hoping the fan finds the airflow.

Method and assumptions

  • TESP = sum of external component pressure drops on the critical (highest-loss) supply and return paths; design TESP = TESP × (1 + margin).
  • Duct values should come from the Duct Sizer, Equivalent Length or Fitting Loss calculators for the critical path only — not every run added together.
  • Pre-filled component values are typical rounded figures for comparison; coils, filters and terminals must use manufacturer data at the actual airflow.
  • Whether coil and filter losses count as 'external' depends on the unit's rating basis — check the manufacturer's fan table. Results shown to 0.01 in. w.g.
Was this helpful?
Important Disclaimer

This calculator is for preliminary design guidance only. Final duct sizing, construction, and installation must be performed by qualified professionals and comply with applicable codes and standards.